We are requesting that when Alternate Closures or Edit Blocks are set up on a Location that when the range end date is met, the system removed the closure or block to keep the scheduling system functioning at maximum efficiency. We are currently have to do this manually and it is very time consuming. We have let it go to long and it is affecting scheduling performance.
Pending automation for removal, a multiselect and remove would be beneficial.